Design and construction supervision for public and private clients
Nature-based solutions (such as constructed wetlands for wastewater treatment) need a good design, which is fundamental to guarantee a reduction of investment costs as well as a long-last functioning of the systems. Moreover, a proper realization is also crucial to respect the designed aims. Therefore, also a proper construction supervision is needed: check of crucial construction activities, use of materials in respect of design specifications, proper execution of the work and acceptance tests. Since common civil construction companies have few experiences with the realization of nature-based solutions, it becomes fundamental a long-last experience in this field.
IRIDRA has a long-last experience in preliminary and detailed design of nature-based solutions, for public and private clients, at national and international level.
Moreover, IRIDRA gained a wide experience in the supervision of realisation works, not only at national but also at international levels, for both developed and developing countries.
System design for public administrations and public bodies.
1995-1998
Impianto fitodepurazione
Progetto Esecutivo impianto fitodepurazione SFS-h + prato umido (350 a.e.). Direzione lavori, avvio e monitoraggio impianto. Loc. Isola di Gorgona – Parco Arcipelago Toscano - Premio Carnia '97.
Committente
Ministero di Grazia e Giustizia - Isola di Gorgona (LI)
Importo lavori
euro 490.634,00
Grado di attuazione
Realizzato
1995-1998
1998
Sistema di trattamento dei reflui civili
Progetto Esecutivo di un sistema di trattamento dei reflui civili mediante fitodepurazione (900 a.e.): sistema a 3 stadi SFS-h+SFS-v+SFS-h .
Committente
Comune di Montecarotto (AN)
(con Studio Tecnico Ing. Gara - Jesi (AN))
Importo lavori
euro 432.274,00
Grado di attuazione
Realizzato